3.1 Risk & Qualitative Assessment (the Risk Matrix)

Theory: Risk & Qualitative Assessment (the Risk Matrix)

In Week 2 you learned to describe how an attack happens: a threat actor uses an attack vector to exploit a vulnerability in a target asset. But knowing that a risk exists is not the same as knowing what to do about it. This lesson turns a list of threats into a ranked list of priorities using the most common tool in security management: the risk matrix, which scores each risk by Likelihood × Impact.

What Is Risk?

Risk is the potential for loss when a threat exploits a vulnerability affecting an asset. It is measured as the combination of how probable that event is and how bad it would be:

Risk=Likelihood×Impact\text{Risk} = \text{Likelihood} \times \text{Impact}

A quick reminder of the building blocks from Week 2:

TermMeaningExample
ThreatA potential cause of harmA hacker, malware, a natural disaster
VulnerabilityA weakness that could be exploitedUnpatched software
RiskThe combination of likelihood and impact if that threat exploits that vulnerability“Ransomware via phishing on the patient database: Possible × Severe”

Diagram loads as you scroll.

Common mistake: treating a threat or a vulnerability on its own as “a risk”. A hacker with no weakness to exploit, or a weakness nobody can reach, is not yet a risk. Risk exists only when a threat, a vulnerability and an asset come together, and it is always described with both a likelihood and an impact.

Why Do We Need to Assess Risk?

No organization can fix every vulnerability, block every threat actor, or eliminate every risk. Every organization has limits:

Risk assessment answers the question “Which problems do we deal with first?” In the words of the course: risk assessment turns a long list of problems into a short list of priorities.

Two Approaches: Qualitative vs. Quantitative

QualitativeQuantitative
How it worksRate Likelihood and Impact on a simple scale (e.g. Low–Medium–High, or 1–5) using judgment and experienceAssign monetary values (approaches such as FAIR or Annualized Loss Expectancy, ALE) to express risk in money
StrengthsFast and intuitive; no hard data requiredPrecise; defensible in a budget case
WeaknessesApproximate and subjectiveNeeds reliable data; much more effort
Typical useWhat most organizations use day-to-dayMajor or high-stakes decisions

This lesson covers the qualitative approach. The quantitative approach (SLE and ALE) is covered in 3.2.

Axis 1: Likelihood (How Probable Is It?)

ScoreLabelMeaning
1RareMay occur only in exceptional circumstances
2UnlikelyCould occur, but not expected
3PossibleMight occur at some point
4LikelyWill probably occur in most circumstances
5Almost CertainExpected to occur, possibly more than once

Likelihood should be grounded in evidence wherever possible: the organization’s own incident logs, industry reports, and known threat activity (for example, “phishing emails reach our staff every week” supports a high likelihood for phishing-based risks).

Axis 2: Impact (How Bad Would It Be?)

ScoreLabelMeaning
1NegligibleLittle to no disruption
2MinorSmall, easily-absorbed disruption
3ModerateNoticeable disruption to operations
4MajorSerious disruption; possible harm to people or trust
5SevereThreatens the organization’s ability to operate

Think back to the CIA Triad (Week 1) when judging impact: impact usually means damage to Confidentiality (patient records leaked), Integrity (medication doses altered) or Availability (EHR down during surgery). Naming the CIA property affected is a quick way to justify an impact score in an exam answer.

Putting It Together: The Risk Matrix

Multiply the two scores to get the risk score, then convert the score into a risk level:

Risk score =Likelihood×Impact= \text{Likelihood} \times \text{Impact} (each 1–5, so the score is 1–25).

Risk levelScore
Low1–4
Medium5–9
High10–16
Critical17–25 (i.e. above 16)

Plotting every possible combination gives the 5 × 5 risk matrix (Impact up the side, Likelihood along the bottom):

Impact ↓ / Likelihood →1 Rare2 Unlikely3 Possible4 Likely5 Almost Certain
5 Severe5 Medium10 High15 High20 Critical25 Critical
4 Major4 Low8 Medium12 High16 High20 Critical
3 Moderate3 Low6 Medium9 Medium12 High15 High
2 Minor2 Low4 Low6 Medium8 Medium10 High
1 Negligible1 Low2 Low3 Low4 Low5 Medium

Reading the matrix: risks in the top-right corner (likely and damaging) are the priorities; risks in the bottom-left corner (rare and minor) can usually be watched rather than fixed.

Mini-example

MediCare Plus’s patient database faces ransomware via phishing. Phishing emails arrive regularly but staff do sometimes report them, so the group rates Likelihood 3 (Possible). Encrypted patient records would stop clinical work, so Impact is 5 (Severe). Score =3×5=15= 3 \times 5 = 15, which falls in 10–16, so the risk level is High.

Common mistakes with the matrix:

  • Adding instead of multiplying. 3+5=83 + 5 = 8 would wrongly give Medium; the correct score is 3×5=153 \times 5 = 15 (High).
  • Mixing up the boundaries. 16 is still High; Critical starts above 16. 4 is still Low; Medium starts at 5.
  • Swapping the axes. “Almost Certain” is a likelihood label; “Severe” is an impact label. Keep the two scales separate.

Scores Are Judgments: Be Ready to Defend Them

Qualitative scores are not “right” or “wrong” in the way a calculation is. Two reasonable analysts may give the same risk a 3 or a 4. What matters is the justification: each score should point to a specific fact (evidence of past incidents, how exposed the system is, which CIA property is damaged, who would be harmed). In the Week 3 group activity, groups score the five asset–threat pairs they mapped for MediCare Plus in Week 2, plot them, and must be ready to defend their numbers, since there is often more than one reasonable answer. Not every risk needs to be Critical.

Grounding in Practice: Standard Frameworks

The risk matrix is not just a classroom exercise. Two widely used frameworks describe the same process:

Different organizations use different frameworks, but the underlying logic is the same:

Diagram loads as you scroll.


Worked Examples

Exercise 1

A MediCare Plus group rates the risk “patient billing records stolen through an unpatched web portal” as Likelihood 4 (Likely) and Impact 5 (Severe). Calculate the risk score and state the risk level.

Show solution ↓
Solution

Multiply the two scores:

Score=Likelihood×Impact=4×5=20\text{Score} = \text{Likelihood} \times \text{Impact} = 4 \times 5 = 20

Compare with the bands: Low 1–4, Medium 5–9, High 10–16, Critical 17–25. Since 20 is above 16, the risk is in the Critical band.

Score = 20, Risk Level = Critical.

Exercise 2

Calculate the score and risk level for each of the following, then rank them from highest to lowest priority.

RiskLikelihoodImpact
A. Guest Wi-Fi used to stream illegal content41
B. EHR outage from a failed storage disk24
C. Infusion pump settings altered over the network25
D. Staff password reused on a breached website44
Show solution ↓
Solution

Multiply Likelihood × Impact for each row, then apply the bands.

RiskCalculationScoreLevel
A4×14 \times 14Low
B2×42 \times 48Medium
C2×52 \times 510High
D4×44 \times 416High

Notice the boundary cases: A (score 4) is still Low, and D (score 16) is still High, not Critical.

Ranking: D (16, High) → C (10, High) → B (8, Medium) → A (4, Low).

Exercise 3

(Mini-case) MediCare Plus’s IT Manager says: “Our guest Wi-Fi is attacked constantly, so it must be our top risk.” The guest network is fully separated from clinical systems and only offers internet access to visitors. Using the risk matrix, explain whether the IT Manager is right.

Show solution ↓
Solution

Risk depends on both likelihood and impact, not on how often attacks happen alone.

  1. Likelihood: attacks on an open guest network really are expected, so Likelihood = 5 (Almost Certain) is reasonable.
  2. Impact: the network is separated from clinical systems and holds no patient data. The worst outcome is that visitors temporarily lose internet access: little to no disruption to the hospital, so Impact = 1 (Negligible).
  3. Score: 5×1=55 \times 1 = 5, which is Medium (at the very bottom of the Medium band).

A risk such as ransomware on the patient database (3×5=153 \times 5 = 15, High) clearly outranks it.

The IT Manager is wrong: a very likely event with negligible impact scores only 5 (Medium); frequency alone does not make a top risk.

Exercise 4

Using only whole-number scores from 1 to 5, list every score that can actually fall in the Critical band. What does this tell you about which risks can ever be Critical?

Show solution ↓
Solution

The Critical band is 17–25. The possible products of two numbers from 1 to 5 that are above 16 are:

  • 4×5=204 \times 5 = 20 and 5×4=205 \times 4 = 20
  • 5×5=255 \times 5 = 25

No pair gives 17, 18, 19, 21, 22, 23 or 24 (for example, 18 would need 3×63 \times 6, and 6 is off the scale).

So a Critical risk must have both scores at 4 or higher, with at least one of them at 5.

Only scores 20 and 25 can be Critical, so a risk is Critical only when it is at least Likely (4) and Major (4), with one of them at the top of its scale (5).

Exercise 5

(Conceptual) Give two advantages and two limitations of qualitative risk assessment compared with quantitative assessment, and say when each approach is the better choice.

Show solution ↓
Solution

Advantages of qualitative assessment

  1. Fast and intuitive: a team can score dozens of risks in one meeting.
  2. No hard data required: expert judgment and experience are enough, which suits organizations (like MediCare Plus) with little loss history.

Limitations

  1. Approximate and subjective: two analysts may score the same risk differently.
  2. Coarse output: it gives a level (Low/Medium/High/Critical), not a money figure, so it cannot by itself show whether a specific investment pays off, and many risks end up tied at the same level.

When to use each

  • Qualitative: routine, day-to-day risk triage across many risks.
  • Quantitative (ALE, see 3.2): high-stakes decisions such as justifying a large budget request to executives or the board, where reliable data is available.